Results

Looking for more? ProQuest® Dissertations & Theses has additional dissertations and theses.
38954 open access dissertations and theses found for:
if(Stochastic project scheduling)  »   Refine Search
2.
Stochastic Cellular Manufacturing System Design and Control
by Egilmez, Gokhan, Ph.D.  Ohio University. 2012: 257 pages; 10631052.
3.
Robust Execution Strategy for Scheduling under Uncertainty
by Fu, Na, Ph.D.  Singapore Management University (Singapore). 2012: 122 pages; 3523785.
4.
Optimal Advertisement Scheduling in Breaks of Random Lengths
by Aravamudhan, Ajay S., M.Sc.  Singapore Management University (Singapore). 2012: 99 pages; 1510792.
5.
Strategic Nurse Allocation Policies Under Dynamic Patient Demand
by Aydas, Osman T., Ph.D.  The University of Wisconsin - Milwaukee. 2017: 273 pages; 10620796.
6.
A Dynamic Stochastic Optimization for Recharging of Plug-in Electric Vehicles
by Liu, Siyan, M.S.  The George Washington University. 2016: 58 pages; 10133981.
7.
Global Operation of Integrated Decentralized Power Systems
by Khanabadi Ghehi, Mojtaba, Ph.D.  Mississippi State University. 2017: 123 pages; 10643425.
8.
Select problems at the intersection of computer science and economics
by Naroditskiy, Victor, Ph.D.  Brown University. 2010: 169 pages; 3430201.
9.
A non-linear discrete stochastic optimization model for Advanced Access patient appointment scheduling
by Sundaram, Ramakrishnan, Ph.D.  Florida International University. 2007: 195 pages; 3268672.
10.
Scheduling policy design using stochastic dynamic programming
by Glaubius, Robert, Ph.D.  Washington University in St. Louis. 2009: 159 pages; 3386643.
11.
Coupling Renewable Energy Supply with Deferrable Demand
by Papavasiliou, Anthony, Ph.D.  University of California, Berkeley. 2011: 99 pages; 3499039.
12.
13.
A Sampling-based Decomposition Algorithm with Application to Hydrothermal Scheduling: Cut Formation and Solution Quality
by Queiroz, Anderson Rodrigo de, Ph.D.  The University of Texas at Austin. 2011: 223 pages; 3530295.
14.
A Heuristic Approach to Utilizing Penalty/Incentive Schemes in Risk Management of a Stochastic Activity Network
by Ahmed, Mohamed Ali E., Ph.D.  The George Washington University. 2014: 238 pages; 3608174.
15.
An Information Model for Subcontractor Resource Allocation
by Wang, Ting-Kwei, Ph.D.  The University of Texas at Austin. 2010: 242 pages; 3484429.
16.
17.
Robust Resource Allocation of Independent Tasks in Heterogeneous Computing Systems via Probabilistic Task Pruning
by Gentry, James A. S., M.S.  University of Louisiana at Lafayette. 2018: 88 pages; 10843501.
18.
19.
Assessing Uncertainty and Risk in an Expeditionary Military Logistics Network
by McConnell, Brandon Mark, Ph.D.  North Carolina State University. 2018: 173 pages; 10970032.
20.
Repair time model for different building sizes considering the earthquake hazard
by Yoo, Dong Y., M.S.  California State University, Long Beach. 2016: 146 pages; 10142981.
21.
Model and algorithm for solving real time dial-a-ride problem
by Kim, Taehyeong, Ph.D.  University of Maryland, College Park. 2011: 187 pages; 3478951.
23.
Optimization and decision making under uncertainty for distributed generation technologies
by Marino, Carlos Antonio, Ph.D.  Mississippi State University. 2016: 119 pages; 10242497.
25.
Development and Validation of a New Air Carrier Block Time Prediction Model and Methodology
by Litvay, Robyn Olson, Ph.D.  The Ohio State University. 2012: 159 pages; 10631204.
26.
A control framework for continuous time adaptation in modern day embedded systems
by Kallakuri, Sankalp, Ph.D.  State University of New York at Stony Brook. 2007: 147 pages; 3334943.
27.
Application hardware-software co-design for reconfigurable computing systems
by Saha, Proshanta, Ph.D.  The George Washington University. 2008: 151 pages; 3297468.
28.
Stochastic particle tracking modeling for sediment transport in open channel flows
by Oh, Jungsun, Ph.D.  State University of New York at Buffalo. 2011: 182 pages; 3460786.
29.
An algorithm-independent platform to solve university timetabling problems
by Farivar, Saeid, M.S.  California State University, Long Beach. 2013: 121 pages; 1522628.
30.
A proposed method to determine confidence in a construction schedule
by Phillips, Homer Clay, Ph.D.  The University of New Mexico. 2009: 186 pages; 3368098.
1 - 30 of 38954 displayed.
  1    2    3    4    5    6    7    8    9    10    11   Next >
Copyright © 2019 ProQuest LLC. All rights reserved. Terms and Conditions Privacy Policy Cookie Policy
ProQuest